What it does
Describe the asset in plain language. PhronEdge identifies the ISO, resource type and registration path, then builds the plan.
Assign each step to a teammate. Status changes, owners, dates and notes are kept in the asset's history.
Steps that need a filing open a guide with the forms, the documents and the portal.
The NERC and ISO standards that apply to the asset's type and size, mapped and cited.
A large load path in all 7 ISOs: ERCOT loads of 75 MW and up, SPP High Impact Large Loads, NYISO load interconnection, and the Transmission Owner path in PJM, MISO, CAISO and ISO-NE.
Every step and its due date in your own calendar app through the calendar feed.
In the product
Watch it work
Every milestone and filing guide for every asset.
How it works
Give its ISO, resource type and capacity, or describe it in plain language.
Every milestone from the first request to commercial operation, each one cited.
Assign steps, file with the guides and track what is done, in progress and next.
Who uses it
Registration is included from Essentials up.