What changes for you
Interconnection and incentive rules decide whether a project gets built on schedule and on budget. These are the rules that move under you.
Interconnection reform: cluster studies, readiness deposits, site control and withdrawal penalties, and each ISO's compliance filing.
Queue reforms and study process changes in ERCOT, PJM, MISO, CAISO, SPP, NYISO and ISO-NE.
The technology-neutral 45Y and 48E credits (TD 10024), the construction deadline guidance in Notice 2025-42 and the prohibited foreign entity rules in Notice 2026-15.
Domestic content, energy community and low-income bonus rules, plus transferability and elective pay.
Category 2 inverter-based resources of 20 MVA or more at 60 kV or above now register with NERC, and the IBR compliance dates follow.
Siting, interconnection and resource rules at the commission in each state you build in.
What you get
Register a solar, wind, storage, gas or hybrid project and get its ISO registration path from application to commercial operation, milestone by milestone.
Assign each step to a teammate. Due dates land on the calendar, and the calendar feed puts them in your own calendar app.
When FERC, an ISO or the IRS changes a rule, the Attention tab shows which projects it affects, why, and the action-by date.
The standards from NERC, FERC, your ISO, your state commission, EPA and IRS that apply to each project, each one cited.
Ask how a credit rule or a queue reform applies and get an answer cited to the order, notice or tariff section.
Entity reports formatted for board review, with your logo, exportable as PDF.
How it works
Give its ISO, resource type and size. PhronEdge lays out the registration plan with every milestone.
Give each step an owner and a due date. The plan tracks what is done, in progress and next.
When an interconnection or credit rule changes, you see which projects it touches and what to do by when.
Also built for
Find out what it was.