What changes for you
Registered assets answer to NERC, their ISO and their state commission at once. These are the rules that keep changing.
Operations and planning standards and the CIP standards, as they are revised and as new versions take effect.
FERC Order 901 and NERC's registration criteria bring solar, wind and storage plants of 20 MVA or more at 60 kV or above under mandatory compliance, with dated milestones.
ERCOT Protocols and Operating Guides, PJM Manuals, MISO Business Practice Manuals and the operating procedures of each ISO.
Rules at PUCT and the utility commissions in all 50 states and the District of Columbia.
Greenhouse gas standards under Section 111, methane standards and the Good Neighbor Plan for fossil units.
EOP-004 event reporting, CIP-008 cyber incidents and DOE Form OE-417, each with its own clock.
What you get
Register each asset. PhronEdge maps the standards from NERC, FERC, your ISO, your state commission, EPA and IRS that apply to it, each one cited.
Every change that needs action: which asset it affects, the impact and the action-by date, as a list or a calendar.
Give each item to a teammate and track it to done before the deadline.
Report an event and get every reporting obligation that applies, the deadline for each, who to notify and what to file.
Follow a new asset's ISO registration from application to commercial operation, and the NERC registration steps for Category 2 IBRs.
Email alerts for high-impact changes, deadlines and enforcement actions, and a digest every Monday.
How it works
Battery, solar, wind, gas, hybrid or large load. Give the ISO, type and capacity.
The standards and rules that apply to each asset are mapped and cited.
Changes arrive matched to the asset, with an action-by date and an owner.